Basic Info.
Product Description
Specification
Elevator steel rope
1.Meet GB8903-88 standard.
2.Many specifications available
3.Dia.: 6 to 22mm
Elevator Rope,Elevator Steel Wire Rope,Lift Wire Rope,Ungalvanized/Galvanized Steel rope, Wire Rope for Elevator
Nova has been supplying high quality elevator wire rope as per customers' requirements as below:
--- 6×19S+Fc, 6×19W+Fc
--- 6×29Fi+Fc, 6×36WS+Fc
--- 8×19S+Fc, 8×19W+Fc, 8×25Fi+Fc
--- 8×19S+IWR, 8×19W+IWR, 8×25Fi+IWR
--- 9×19S+IWR, 9×19W+IWR, 9×21Fi+ IWR, 9×19S+9×7+Fc, 9×19W+9×7+Fc, 9×21Fi+9×7+Fc
Re:
1. Meet GB8903 standard.
2. Elevator speed of more than 2 m/s should be specified when ordered.
Ropes For Over Speed Governor | |||||
6*19S+FC 6*19W+FC | |||||
Construction | |||||
Nominal rope diameter | 6*19S+FC | Minimum breaking load | |||
Dual tensile,Mpa | Single tensile,Mpa | ||||
1370/1770 | 1570/1770 | 1570 | 1770 | ||
mm | Kg/100m | kN | kN | kN | kN |
6 | 12.9 | 17.8 | 19.5 | 18.7 | 21 |
6.5 | 15.2 | 20.9 | 22.9 | 21.9 | 24.7 |
8 | 23 | 31.7 | 34.6 | 33.2 | 37.4 |
1. This rope is for low speed, low duty elevators. 2. If elevator with high speed, pls contact us. 3. We can also produce as customer's requirement. 4. Above specifications just for your reference, error may occur in actual. |
Ropes For Traction Machine | |||||
Natural fiber core (NFC): Suspension ropes for medium duty elevators Elevator speed≤2.0M/S, Building height≤60M | |||||
8*19S+FC 8*19W+FC | |||||
Construction | |||||
Nominal rope diameter | Approx weight | Minimum breaking load | |||
Dual tensile,Mpa | Single tensile,Mpa | ||||
1370/1770 | 1570/1770 | 1570 | 1770 | ||
mm | Kg/100m | kN | kN | kN | kN |
8 | 21.8 | 28.1 | 30.8 | 29.4 | 33.2 |
9 | 27.5 | 35.6 | 38.9 | 37.3 | 42 |
9.5 | 30.7 | 39.7 | 43.6 | 41.5 | 46.8 |
10 | 34 | 44 | 48.1 | 46 | 51.9 |
11 | 41.1 | 53.2 | 58.1 | 55.7 | 62.8 |
12 | 49 | 63.3 | 69.2 | 66.2 | 74.7 |
13 | 57.5 | 74.3 | 81.2 | 77.7 | 87.6 |
14 | 66.6 | 86.1 | 94.2 | 90.2 | 102 |
15 | 76.5 | 98.9 | 108 | 104 | 117 |
16 | 87 | 111.3 | 123 | 118 | 133 |
17.5 | 104 | 135 | 147 | 141 | 159 |
18 | 110 | 142 | 156 | 149 | 168 |
19 | 123 | 159 | 173 | 166 | 187 |
20 | 136 | 176 | 192 | 184 | 207 |
20.6 | 144 | 187 | 204 | 195 | 220 |
22 | 165 | 213 | 233 | 223 | 251 |
Suspension ropes for elevator speed≤4.0M/S, Building height≤100M | ||||||||||||
8*19S+IWRF 8*19W+IWRF 8*19S+IWRC 8*19W+IWRC | ||||||||||||
Construction | ||||||||||||
Nominal rope diameter | Approx weight | Minimum breaking load | ||||||||||
Dual tensile,Mpa | Single tensile,Mpa | |||||||||||
1370/1770 | 1570/1770 1620/1770 | 1570 | 1620 | 1770 | ||||||||
IWRC | IWRF | IWRC | IWRF | IWRC | IWRF | IWRC | IWRF | IWRC | IWRF | IWRC | IWRF | |
mm | Kg/100m | kN | kN | kN | kN | kN | ||||||
8 | 26 | 25.9 | 35.8 | 35.2 | 38.0 | 37.4 | 35.8 | 35.2 | 36.9 | 35.2 | 40.3 | 39.6 |
9 | 33 | 32.8 | 45.3 | 44.5 | 48.2 | 47.3 | 45.3 | 44.5 | 46.7 | 45.9 | 51 | 50.2 |
9.5 | 36.7 | 36.6 | 50.4 | 49.6 | 53.7 | 52.8 | 50.4 | 59.6 | 52 | 51.2 | 56.9 | 55.9 |
10 | 40.7 | 40.5 | 55.9 | 55 | 59.5 | 58.5 | 55.9 | 55 | 57.7 | 56.7 | 63 | 62 |
11 | 49.2 | 49 | 67.6 | 66.5 | 79.1 | 70.7 | 67.6 | 66.5 | 69.8 | 68.6 | 76.2 | 75 |
12 | 58.6 | 58.3 | 80.5 | 79.1 | 85.6 | 84.2 | 80.5 | 79.1 | 83 | 81.6 | 90.7 | 89.2 |
12.7 | 65.6 | 65.3 | 90.1 | 88.6 | 95.9 | 94.3 | 90.1 | 88.6 | 93 | 91.5 | 102 | 99.9 |
13 | 68.8 | 68.4 | 94.5 | 92.9 | 100.0 | 98.8 | 94.5 | 92.9 | 97.5 | 98.5 | 106 | 105 |
14 | 79.8 | 79.4 | 110 | 108 | 117 | 115 | 110 | 108 | 113 | 111 | 124 | 121 |
14.3 | 83.2 | 82.8 | 114 | 112 | 122 | 120 | 114 | 112 | 118 | 116 | 129 | 127 |
15 | 91.6 | 91.1 | 126 | 124 | 134 | 132 | 126 | 124 | 130 | 128 | 142 | 139 |
16 | 104 | 104 | 143 | 141 | 152 | 150 | 143 | 141 | 148 | 145 | 161 | 159 |
17.5 | 125 | 124 | 171 | 166 | 182 | 179 | 171 | 168 | 177 | 174 | 193 | 190 |
18 | 132 | 131 | 181 | 178 | 193 | 189 | 181 | 178 | 187 | 184 | 204 | 201 |
19 | 147 | 146 | 202 | 198 | 215 | 211 | 202 | 198 | 208 | 205 | 227 | 224 |
20 | 163 | 162 | 224 | 220 | 238 | 234 | 224 | 220 | 231 | 227 | 252 | 248 |
20.6 | 173 | 172 | 237 | 233 | 252 | 248 | 237 | 233 | 245 | 241 | 267 | 263 |
22 | 197 | 196 | 271 | 266 | 283 | 283 | 271 | 266 | 279 | 274 | 305 | 300 |
·Shaft Components includes
Machined /Cold Drawn/ Hollow Guide Rail, Fishplate, Fasteners, Anchor Bolt, Rail Rracket etc.
·Elevator Cabin includes
Complete Elevaotr Cabin, Car Frame, Counterweight Frame and Counterweight Block,Guide Shoes, Rope Attachment etc.
·Door System includes
Mitsubishi, Fermator and Selcom Door Operator and Landing Door, Door Panel, Door Spare Parts,Safety Light Curtain/Photocell etc.
·Safetey Components includes
Safety Gear, Speed Governor, Rope Brake, Oil Buffer and Rubber Buffer etc.
·Traction System includes
Geared/Gearless Traction Machine, Pulley Sheave,Anti-Vibration Pad,Steel Wire Rope etc.
·Electrical Components inclueds
Integrated and Separated Controlling Cabinet,Yaskawa L1000A Inverter, Elevator Display,COP&LOP&HOP, Elevator Button, Flat Traveling Cable etc.
Our Services
1.Help Customers Source in China to Reduce their Cost
To provide customers with whole purchasing plan of elevator parts;
To find out the best conjunction point between quality and price to reduce costs for thrm.
2.How to develop the suppliers for customers
To get customers' need throughing communicating;
To find out three to four customers of thr corresponing parts according to the request of the customers.
3.Customers ask price and get samples from the factories.
To visit the factory(acknowledge the productin ability and quality control process);
Basing on the price,sample and visiting,recommend factory to our customers.
4.How to help customers order from the qualified suppliers.
Follow the process of order;
Send QC to inspect on site before shipping to acknowledge the product quality;
Transfer the response from the customers to suppliers on time, and follow up the improvement.
5.Special package services
Gather sourced parts for dispatch;
Help customers shipping products directly to the working site oversea;
Quick reponse.
1. Price
Re: please send us inquiry from Alibaba, we will qutoe to you within 24 hours. It's more convenient and appreciated for us if you provide your company details and your detail inquiry for with elevators.
2. Payment term
Re: T/T or L/C at sight.
3. Installation&Maintaining
Re: We will send installation&maintaining manual along with the with elevator.
Our sugguestion is to hire a professional local company for installation and future maintaining,
once you need any technical assistant from us, just don't hesitate to contact us by mail or phone.
Technician will be sent to the job site if necessary.
4. Shipping&price term
Re: Both FOB/CIF/CFR price term are ok, we have reliable forwarder helping arrange the shipment for you.